PRODUCT.ENGINEER
ManifestoThe RolePlaybookLoops
All loops
AgenticManual

Context Compression Loop

Iteratively summarize/compress project context until it fits target token budget.

Compatible tools:Claude CodeCursor
Start the "Context Compression Loop" loop.

- Goal: Project context document fits within the target token budget (default: 5000 tokens / ~4000 words) while retaining all information necessary for agent success.
- Max iterations: 6
- Between iterations run: `wc -w CONTEXT.md`
- Exit when: word count is under 4000 words AND the context still contains all critical constraints and conventions.

Steps:
1. Measure the current context document size
2. If under budget, stop — exit condition met
3. Identify the lowest-value content: redundant examples, obvious statements, verbose explanations
4. Apply compression techniques:
   - Replace paragraphs with bullet points
   - Collapse multiple examples to one representative example
   - Remove information derivable from the codebase (file structure, obvious patterns)
   - Merge overlapping rules into single, more general statements
   - Remove historical context that doesn't affect current behavior
5. Verify no critical constraint was lost — cross-check against the last 5 agent failures
6. Re-measure and continue if still over budget

Self-pacing instructions: After each iteration, run the check command, read the output, and only continue if the exit condition is not met. Stop when exit condition passes or max iterations reached. Give a short status update each pass.

How it works

Context Compression Loop

yesoverMeasure doc sizeUnder budget?Find low-value contentApply compressionCritical info intact?Context fits
product.engineer

Owning the whole loop, from idea to impact.

Learn

  • Blog
  • Manifesto
  • Authors
  • RSS Feed

Tools

  • Loops
  • Playbook
  • Discovery
  • Cloud Maturity
  • 5 Whys

Opportunities

  • Jobs
  • Hot Jobs
  • Companies
  • The Role
© 2026 product.engineer
||